Outside air
Verified at the unit rather than assumed from a damper position. Economizers checked for actual function, which is where a surprising number of them fail.
Office and R&D suites, small retail, fit-outs and equipment rooms. Smaller than a mechanical contractor's minimum, larger than most residential outfits will take on — which is exactly the gap this work sits in.
Most of the office and R&D stock around East Middlefield and the Bayshore corridor is conditioned by packaged rooftop units, frequently one per suite, frequently installed by whoever fitted out the last tenant.
The recurring problems are consistent: units sized for a floor plan that no longer exists, economizers seized shut, schedules still set for a tenant who left in 2019, and returns that were re-routed around a partition wall nobody documented.
When a suite is reconfigured, the mechanical system almost never is. New partitions land across existing diffusers, a conference room appears where a corridor was, and a fully glazed corner office inherits a single register sized for a storage cupboard.
We work to the architect's drawings where there are drawings and to a measured survey where there are not, which in a building on its fourth tenant is most of the time.
A room full of running equipment has a load that does not care what season it is, what time it is, or whether the office next door is occupied. It needs cooling at three in the morning in January.
The common failure mode is a room served by the building's comfort system, which shuts down on schedule at seven in the evening. It works perfectly until the first evening somebody notices the room at 95°F.
In a commercial space, ventilation is not a comfort preference. It is a code requirement with a number attached, and at handover somebody will ask to see it demonstrated.
Verified at the unit rather than assumed from a damper position. Economizers checked for actual function, which is where a surprising number of them fail.
Restrooms, break rooms, copy and storage areas, and any process or laboratory extraction the space was built with.
Exhaust without matched make-up air pulls conditioned air out of the suite and makes entry doors hard to open. Measured, not guessed at.
Measured at every diffuser and return, adjusted, and issued as a written balance report at handover.
Deeper filter sections where the tenant wants better filtration, with the static pressure penalty measured rather than discovered later.
Permit, Title 24 forms, balance report and closed inspection, handed over as one file for the building record.
We are a small shop. We do not run a 24-hour dispatch desk, and saying we did would be a promise we could not keep at three in the morning in February.
If your operation genuinely cannot tolerate an overnight outage, the right answer is redundancy designed in — two units instead of one, alarms wired out — rather than a contractor's emergency number. We would rather build that with you than sell you a response time we cannot honour.
A survey, an asset list and a written scope before anybody talks about price.